CHAMBER OF DEPUTIES – ROME 2018-09-03T21:13:27+00:00

Project Description

PAL. MONTECITORIO – COMPLEX OF THE SEMINAR – VICOLO VALDINA COMPLEX – PAL. THEODOLI – PAL. EX BANCO DI NAPOLI

  1. Change of supply voltage from 8.4 to 20 kV and replacement of medium voltage electric panels (QGMT) of the buildings of the Chamber of Deputies.
  2. Reconstruction of the general electric low voltage switchgear (QGBT) of all the buildings in the Chamber of Deputies.
  3. Realization of emergency lighting system with centralized supervision verification system, in all the buildings of the Chamber of Deputies.
  4. Realization of an absolute continuity system for the CED (data processing center) of Palazzo Montecitorio and Palazzo Theodoli.
  5. Installation of new Generating Sets (G.E.) at Palazzo Montecitorio and the Complex of the Seminary.
  6. Realization of protection system against atmospheric discharges (Faraday Cage) at the Montecitorio building.
  7. Realization of lighting system with LED technology of the external facades of Palazzo Montecitorio and the former Banco di Napoli building.
  8. Realization of the lighting system with blue LED technology of the facade of Palazzo Montecitorio, for the world day of awareness on autism established by the UN General Assembly (event: Light it up blue).
  9. Implementation of a photovoltaic system at the Seminary Complex.
  10. Realization of lighting system with LED technology of the cloister of the Complex of Vicolo Valdina and of the church of S. Gregorio Nazianzeno.
  11. Realization of the electrical distribution and lighting control system of the Palazzo di Montecitorio
    LED lighting system for energy efficiency and adaptation of lighting levels.
  12. Redevelopment of the LED technology lighting system.